To augument the water resources available in Wadi Al karak by construction of Al Karak Dam at Jordan Construction of a cyclopean and reinforced concrete gravity dam.

Dam 32 m high, 201.4 m long
Main Spillway width (Ogee, Un gated) 36 m
No of construction blocks 12
Common excavation 71,000 cum
Rock excavation 70,000 cum
Concrete 61,824.5 cum
Drilling 5,000 m
Grouting (cement ) 45,000 kg
Reinforcement steel 877 MT
Client Ministry of Water and Irrigation Jordan valley Authority, Jordan