Jammu Udhampur Rail Link Project, India
Laying of Ballastless track total length = 5364 m
Tunnel 4 & 5 -830 m(straight-660.68m & curved-169.31m)
Tunnel 8 -2445 m straight
Tunnel 9 & 9A -899 m (Straight-260.44 m & curved -270.33m)
Tunnel 10 A 1099 M (Straight-260.44 m & curved -829.56m)
Laying levelling coarse with PCC | 2423 Cum |
Laying Road Bed Concrete (M20) | 7417 Cum |
Final Linking of Track | 5264 M |
Purpose | Rail Transport |
Client | Northern Railway, India |