top bar
Jammu Udhampur Rail Link Project
Jammu Udhampur Rail Link Project, India

Laying of Ballastless track total length = 5364 m
Tunnel 4 & 5               -830 m(straight-660.68m & curved-169.31m)
Tunnel  8                     -2445 m straight
Tunnel 9 & 9A            -899 m (Straight-260.44 m & curved -270.33m)
Tunnel 10 A                1099 M (Straight-260.44 m & curved -829.56m)

Laying levelling coarse with PCC 2423 Cum
Laying Road Bed Concrete (M20) 7417 Cum
Final Linking of Track 5264 M
Purpose Rail Transport
Client Northern Railway, India

bottom bar