Chamera Hydro-Electric Project, India
9.5 meter finished diameter horse shoe shaped Power Tunnel including large scale drilling, blasting and excavation in rocks, concrete lining, cement and sand grouting, steel supports and anchor bolting at Chamera, Himachal Pradesh, India.
Tunnel | 9.5 M dia, 3700 M. long |
Rock Excavation | 404,000 cum |
Steel Support | 1,000 MT |
Concrete Tunnel Lining | 50,000 cum |
Rock Bolting | 121,000 M |
Shotcreting | 8,000 cum |
Purpose | Hydro Power Generation (540 MW) |
Client | National Hydroelectric Power Corporation Ltd. India |