top bar
Narmada Main Canal Project
Narmada Main Canal Project, India

The work comprised of earthwork, mechanised concrete lining and construction of structures in 29 KM length of the Main Canal designed for a capacity of 40,000 cusecs at head and construction of bridge over canal.

Excavation 9,100,000 cum
Earthwork in Embankment 8,050,000 cum
Concrete Lining 3,133,426 sqm
Reinforcement Steel 15,000 MT
Concrete for Structures 171,900 cum
Excavation for foundation 651,736 cum in structures

bottom bar