Nathpa Jhakri Hydroelectric Project, India
- Diversion and care of river Satluj - U/S & D/S cofferdams and a 8M dia, 721M long diversion tunnel on right bank.
- Construction of concrete gravity dam of 60.50M high and 170m long.
- 4 intakes with opening of size 19.96M x 15.75M
- 4 underground desilting chambers of size 525m x 16.30m x 27.50m each
- 5M diameter, 1675m long horse shoe shaped flushing tunnel, 4 gate shafts for flushing tunnels and all allied works.
Open excavation | 4,21,690 cum |
U/G excavation | 12, 12, 502 cum |
Structural steel | 7,049 mt |
Rockbolting | 2,67,820 m |
Wiremesh | 689 mt |
Reinforcement steel | 12,297 mt |
Drilling and grouting | 3,59,790 m |
Concrete | 4,19,014 cum |
Shotcrete | 12,590 cum |
Embedments and metal works | 12896 mt |
Client | Satluj Jal Vidyut Nigam Ltd. India |